双乳被一左一右吃着的,无码人妻精品一区二区三区在线,真人高清实拍女处被破的视频,啊灬啊灬啊灬快灬高潮了女

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
Industry news

Where are you now:Home >> News >> Industry news
What should be paid attention to in the environmental requirements and processing of the SMT chip processing workshop?
Time:2023-09-07 Read: 2765

The SMT chip processing workshop has environmental requirements for cleanliness, humidity and temperature, and it needs to work according to certain environmental requirements during processing. At the same time, we also need to pay attention to related matters. Next, Lexus will introduce the relevant content in detail.


1. Environmental requirements of SMT chip processing workshop


SMT production equipment is a high-precision mechatronics equipment. Equipment and process materials have certain requirements on environmental cleanliness, humidity and temperature. In order to ensure the normal operation of equipment, reduce environmental damage to components, and improve quality, the SMT workshop environment has the following requirements:


1. Power


Generally, single-phase AC 220 (220±10%, 0/60Hz) and three-phase AC 380 (380±10%, 50/60Hz) are required, and the power of the power supply is more than twice the power consumption.


2. Air source


According to equipment requirements, air source pressure can be configured. The factory air source can be used, or an oil-free compressed air machine can be configured separately. The general pressure is greater than 7kg/cm2. Clean and dry purified air is required, so degreasing, dusting and watering of the compressed air is necessary. The air duct adopts stainless steel or pressure-resistant plastic pipe.


3. Exhaust gas


Reflow and wave soldering equipment should be equipped with exhaust fans. For a full hot blast stove, the minimum flow rate for the exhaust pipe is 500 cubic feet per minute (14.15m3/min).


4. Temperature and humidity


The best ambient temperature of the production workshop is 23±3℃, generally 17~28℃, and the relative humidity is 45%~70%RH. According to the size of the workshop, set up appropriate temperature and humidity meter for regular monitoring, and provide temperature and humidity adjustment facilities.


5. Anti-static


Workers should wear anti-static clothes, shoes and anti-static wristbands before entering the workshop. The anti-static work area should be equipped with anti-static floors, anti-static table mats, anti-static packaging bags, turnover boxes, PCB racks, etc.


2. Precautions for SMT chip processing


1. Refrigeration of solder paste


I just bought the solder paste. If not used immediately, it needs to be refrigerated. The temperature should be between 5℃-10℃, not lower than 0℃.


2. Replace the products that are easily worn by the placement machine in time.


During the placement process, due to the aging of the placement machine equipment and the damage to the nozzle and feeder, it is easy to cause the placement machine to tilt, resulting in a large amount of material thrown, reducing production efficiency and increasing production costs. If the mounter cannot be installed, carefully check whether the suction nozzle is blocked or damaged, and whether the feeder is in good condition.


3. Measure the furnace temperature


The quality of PCB soldering is closely related to the reasonable setting of reflow soldering process parameters. Generally speaking, in order to continuously improve the temperature curve and set the temperature curve suitable for welding products, it is necessary to test the furnace temperature twice a day, at least once a day. For productivity and cost savings, don't miss this link.


Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: m.ya198.com

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號
  • Links:
色欲久久99精品久久久久久av| 少妇呻吟翘臀后进爆白浆| 亚洲爆乳成人无码aaa片漫画| 色偷偷人人澡人人爽人人模重口 | 麻豆国产精品va在线观看不卡| 亚洲精品国产精品乱码视色| 色橹橹欧美在线观看视频高清| 久久精品一区二区三区av| 又硬又粗进去好爽a片看| 无码毛片AAA在线| 嗯灬啊灬把腿张开灬a片| 狠狠色噜噜狠狠亚洲av| 水蜜桃av无码| 欧美久久久无码精品亚洲日韩小说| 国产无遮挡裸体免费视频| 一个人看的www片高清在线| 久激情内射婷内射蜜桃| 久久国产欧美国日产综合抖音 | 亚洲浮力影院久久久久久| 嗯灬啊灬把腿张开灬a片| 在线观看免费a∨网站| 国产精品内射后入合集| 无码中文字幕一区二区三区| 翁与小莹最新第九部| 中文无码熟妇人妻av在线| 天天摸天天做天天爽天天弄| 国产成人涩涩涩视频在线观看| 久久99久久99精品中文字幕 | 欧美牲交a欧牲交aⅴ久久| 99久久精品国产免费| 无人在线完整免费高清观看| 午夜不卡久久精品无码免费| 天天躁夜夜躁狠狠躁2021A2| 国产丰满老熟妇乱xxx1区| 国模裸体无码XXXX视频| 日本高清视频www| 亚洲av午夜成人片精品网站| 国产jk精品白丝av在线观看| 免费国产又色又爽又黄的网站| 99精品久久精品一区二区| 局长含着秘书的小奶头|