双乳被一左一右吃着的,无码人妻精品一区二区三区在线,真人高清实拍女处被破的视频,啊灬啊灬啊灬快灬高潮了女

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
FAQ

Where are you now:Home >> News >> FAQ
What exceptions will occur during SMT production? Normally
Time:2021-10-08 Read: 2401

1. Ideal solder joints

It has good surface wettability, that is, the molten solder should spread on the surface of the welded metal and form a complete, uniform and continuous solder covering layer, and its contact angle should not be greater than 90


The correct amount of solder, the amount of solder is sufficient but not too much or too little

For a good welding surface, the surface of the solder joint should be complete, continuous and smooth, but it does not require a very bright appearance.

Good solder joint position The position deviation of the solder end or pin of the component on the pad is within the specified range.


2. No wetting

The contact angle formed by the solder on the solder joint and the surface of the welded metal is greater than 90


3. Open welding

The pad is separated from the PCB surface after soldering.


4. Suspension bridge (drawbridging)

One end of the component leaves the pad and faces the bag upright diagonally or upright


5. Bridging

The solder between two or more solder joints that should not be connected is connected, or the solder joints of the solder joints are connected with adjacent wires.


6. Welding

After soldering, electrical isolation sometimes occurs between the solder end or the pin and the pad


7. Draw the tip

There are solder burrs protruding outward in the solder joints, but they are not in contact with other conductors or solder joints


8. Solder ball

A small ball of solder that adheres to the printed board, the solder mask or the conductor during soldering.


9. Holes

Holes with different apertures appear in the weld


10. Position offset (skewing)

When the solder joint deviates from the predetermined position in the horizontal, vertical or rotational direction in the plane.


11. Visual inspection

With the aid of a magnifying glass of 2~5 times of the illumination, inspect the quality of PCBA solder joints with naked eyes


12. Inspection after aoldering

Quality inspection after PCB is soldered.


13. Reworking

Repair process to eliminate local defects of surface mount components.


14. Placement inspection

When surface mount components are mounted or after they are mounted, quality inspection is carried out for any missing, misplaced, mis-mounted, damaged, etc. conditions.


In SMT inspection, two methods, visual inspection and optical equipment inspection, are often used. Some only use the visual inspection method, and there are also two mixed methods. They can all inspect the product, but if the visual inspection method is used, people will always get tired, so there is no guarantee that employees will conduct a careful inspection. Therefore, we need to establish a balanced inspection and monitoring (monitering) strategy that is to establish quality process control points.


In order to ensure the normal operation of SMT equipment, strengthen the quality inspection of the processed workpieces in each process, so as to monitor its operating status, and establish quality control points after some key processes. These control points are usually established in the following locations:


1) PCB inspection

a. Whether the printed board is deformed; b. Whether the pad is oxidized; c. Whether the surface of the printed board is scratched;

Inspection method: visual inspection according to inspection standards.


2) Silk screen inspection

a. Is the printing complete; b. Is there any bridging; c. Is the thickness uniform; d. Is there any sag; e. Is there any deviation in the printing;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


3) Patch inspection

a. The placement position of the component; b. Whether there is a chip; c. whether there is a wrong part;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


4) Reflow soldering inspection

a. The soldering condition of the component, whether there are bad soldering phenomena such as bridging, tombstones, dislocation, solder balls, virtual soldering, etc. b. Soldering joints.

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: m.ya198.com

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號
  • Links:
免费追剧大全电视剧网站影视大全 | 国产精品爽黄69天堂a| 边做饭时猛然进入高h| 97精品人人a片免费看| 偷看农村女人做爰毛片色| 日韩精品无码一本二本三本色| 欧美性色黄大片a级毛片视频| 亚洲人成在线观看| 色婷婷综合久久久久中文| 少妇做爰免费视看片| 影音先锋中文字幕人妻| 无码人妻av免费一区二区三区| 好紧好爽再浪一点荡货h| 亚洲av永久无码嘿嘿嘿| 西西人体做爰大胆视频韩国 | 小雪被老外黑人撑破了视频| 亚洲精品久久久久久不卡| 国产一区二区三精品久久久无广告| 日韩乱码人妻无码中文字幕久久 | 中文字幕无码无码专区| 天天躁夜夜躁天干天干2020 | 亚洲精品久久久久av无码| 久久亚洲精品中文字幕| 国产超碰人人模人人爽人人添| 国产精品久久久久久吹潮| 少妇AV一区二区三区无码| 欧美人妻日韩精品| 久久午夜夜伦鲁鲁片无码免费| 亚洲熟妇无码八AV在线播放| 久久综合九色欧美综合狠狠| 小处雏一区二区三区精品视频| 人妻激情偷乱一区二区三区| 日本一区二区在线播放| 欧美激情性做爰免费视频| 强开小婷嫩苞又嫩又紧视频| 日韩夜夜高潮夜夜爽无码| avtom影院入口永久在线| 亚洲日本乱码在线观看| 久久久国产精华液| 久久婷婷人人澡人人爽人人爱| 无码精品人妻一区二区三区人妻斩|